My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1070 - SP1076
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP0822 - SP1254
>
SP1070 - SP1076
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 1:11:23 PM
Creation date
1/23/2016 12:06:14 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Eighth Street and Mission Road Resurfacing
Year
1991
Project Engineer
Larry Violett
Roads Worked
Eighth St.; Mission Rd.
Red Lines
Yes
Federal #
Federal Aid Urban Project No. M-00R (43)
Supplemental fields
Classification
Record Drawings
Cross Ref
SP1070 - SP1076
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Eighth Street <br /> Conform ® E.P. ADJUST MANHOLE PLANING ASPHALT <br /> FRAMES AND COVERS CONCRETE PAVEMENT <br /> , •*� ■� Location Quantity Location Quantity <br /> Sta. 10+08 Lt. 1 Each Sta. 9+65 to Sta. 9+85 87 S.Y. <br /> Stc. 21+77 Rt. 1 Each Sta. 21 +22t to Sta. 22+20t Lt. 65 S.Y. <br /> 0.08' Ste. 30+16 Rt. 1 Each Sta. 21 +22t to Sta. 23+15t Rt. 129 S.Y. <br /> c <br /> Sta. 32+85 to Stc. 32+95 70 S.Y. <br /> '� Total 3 Each Bieghle St. 33 S.Y. <br /> y.�`• 1 Ash St. 21 S.Y. <br /> 0V) Laurel Ave. 23 S.Y. <br /> Total 428 S.Y. <br /> INTERSECTION DETAILS ADJUST LAMPHOLE <br /> Ash Street FRAMES AND COVERS <br /> Laurel Avenue <br /> Location Quantity SHOULDER BACKING <br /> Sta. 32+23 Rt. 1 Each Location Quantity <br /> See Note Below Existing Surface �Sta. ,„ �t0 to 32+95 90 Tons <br /> Oct , <br /> 0 <br /> a ..,,..__. ............. .... . 'date <br /> it <br /> PAVEMENT REPAIR Any Person using This Drawiq <br /> "X" Asphalt ConcreteI f+ <br /> C <br /> Location Quantity <br /> tg <br /> PAVEMENT REPAIR DETAIL 6 sites throughout 142 S.Y. (Type B) <br /> Note: Width, length and locations to be project <br /> D determined by the Engineer. Location Quantity <br /> 3 <br /> m "X" = 0.70' in 12' traffic lane <br /> "X' = 0.45' outside of 12' traffic Ione (Shoulder Area) �OQg0FESS10Nq Roadway 1,238 Tons <br /> M.Nigq� pavement Repair 58 Tons <br /> y v Intersections 23 Tons <br /> b v z <br /> U" v t No. 21258 m Total 1,319 Tons <br /> ,t L.p 9311.SJ (A <br /> M <br /> 9clvJ %k- <br /> OFC Al1F% <br /> Z COUNTY OF SAN JOAQUIN N❑ SCALE CONSTRUCT]ON DETAILS EIGHTH STREET RESURFACING s"4 of <br /> o <br /> w AND NOTES Bie nle St. to o St. <br /> Drawn By Date Project Engineer Date Checked Date Submitted Datexray fommended Date <br /> 411,1f <br />
The URL can be used to link to this page
Your browser does not support the video tag.