My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1108 - SP1112
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP0822 - SP1254
>
SP1108 - SP1112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 1:14:03 PM
Creation date
1/23/2016 12:08:58 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Jack Tone Road Resurfacing
Limits
Wildwood Rd. to French Camp Rd.
Year
1991
Project Engineer
J.C. White
Roads Worked
Jack Tone Road
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP1108 - SP1112
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ASPHALT CONCRETE GENERAL NOTES <br /> PAVEMENT REPAIR (Type B) 1 . Asphalt Concrete used for Pavement Repair shall be placed <br /> Location Quantity in layers which do not exceed 0.50' in compacted thickness. <br /> Location Quantity <br /> 18 Sites throughout Project 390 S.Y. 2. Placement c Asphalt Concrete Surfacing shall not begin until <br /> g � Roadway 7381 Tons Asphalt Concrete used in pavement repair has been in place <br /> Driveways 75 Tons for a minimum of 36 hours. <br /> Pavement Repair 195 Tons <br /> Total 7651 Tons 3. Existing pavement markers may remain in place where overlay <br /> PLANING ASPHALT thickness is 0.25' or greater. <br /> CONCRETE PAVEMENT 4. Asphalt Concrete Surfacing shall be placed in 2 layers of <br /> approximate equal thickness. Pavement Reinforcing Fabric <br /> Location Quantity PAVEMENT REINFORCING Shall be placed between the layers. <br /> FABRIC 5. Survey Monument Frames and Covers shall be placed at the <br /> Sta.1098+00 to Sta.1098+50 178 S.Y. following locations: <br /> Sta.1129+66 to Sto.1130+16 178 S.Y. Location Quantity Sta.1122+35± Sto.1175+37 ± <br /> Sto.1130+74 to Sta.1131+24 178 S.Y. Sta.1148+86± Sto.1201+83 + Conform ® E.P. <br /> Sto.1188+26 to Sta.1188+76 178 S.Y. Sta.1098+50 to Sta.1129+66 8309 S.Y. <br /> Sto.1189+34 to Sta.1189+84 178 S.Y. Sta.1131+24 to Sta.1188+26 15205 S.Y. <br /> Sta.1226+10 to Sto.1226+60 178 S.Y. Sto.1189+84 to Sta.1226+10 9670 S.Y. <br /> Total 1068 S.Y. Total 33,184 S.Y. R„ - Conform to 'P �• <br /> existing radii Conform m <br /> PLACE MONUMENT Exact location to be 1 <br /> SHOULDER BACKING determined by the <br /> Location Quantity FRAMES AND COVERS Engineer —wi 12' Min. Width , <br /> ° ' Sto. 1098+00 to Sta. 1226+60 5800 TONS Location Quantity Conform ® E.P. <br /> Total 5800 TONS StcA 122+35± 1 Ea. <br /> Sta.1148+86 ± 1 Ea. <br /> Sta.1175+37 ± 1 Ea. <br /> Sta.1201+83± 1 Ea. <br /> DRIVEWAYS Total 4 Ea. <br /> Quantity — <br /> Type No. Area S.Y. EARTHWORK <br /> (Miscellanous Areas) --� 12' Min. Width— Conform <br /> D 7 231 S.Y. LEGEND <br /> � E 7 211 S.Y. Location Quantity <br /> n 7kY Sta.1219+70 to Sta.1226+60 7 Sta. TYPE E Varible depth Asphalt Concrete <br /> Vice4/)q-r7 over existing paved driveway. <br /> (Right Const.— only) <br /> iV p TYPE D 0.30' A.C. over shaped native <br /> v <br /> TYPICAL DRIVEWAY <br /> J CONSTRUCTION DETAILS JACK TONE ROAD RESURFACING SHEET No. <br /> COUNTY OF SAN JOAQUIN SCALE: None AND NOTES I Wiidwood Rd. to French Comp Rd. 5 of 5 <br /> DRAWN BY DATE PROJECT NGINEER DATE CHECKED I DATE SUBMITTED I DATE APPRO ECOMMENDED DATE 0-15, /39/ <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.