Laserfiche WebLink
i <br /> M H� <br /> No. 21258 <br /> * E* 9-30-97 <br /> 9TF CMI ?tee <br /> CA0i <br /> PAVEM NT REPAIR PLANING ASPHALT DRIVEWAYS <br /> Location Quantity CONCRETE PAVEMENT Quantities <br /> Sta. 91+85 Lt. 10 S.Y. Location Quantity Type No. Area <br /> Sta. 92+00 X—Drain 21 S.Y. Sta. 62+00 to Sta. 62+30 107 S.Y. D 24 580 S.Y. <br /> Sta. 119+60 Lt. 13 S.Y. Sta. 172+35 to Sta. 172+55 81 S.Y. E 57 1,835 S.Y. <br /> Total 44 S.Y. Roadway Total 188 S.Y. <br /> Intersections <br /> Bull Pine Road 33 S.Y. <br /> Bern Avenue 37 S.Y. <br /> Patrick Avenue (N) 30 S.Y. ASPHALT CONCRETE <br /> Patrick e s 46SY:OBLITERATE SURFACING ula A nue S.Y. <br /> TYPE B <br /> Patton Avenue 40 S.Y. Location Quantity <br /> Location Quantity Sibley Avenue 41 S.Y. <br /> n Best Road 33 S.Y. Roadways 6,209 Tons <br /> Stu. 62+80 to Sta. 78+65 Lt. 15.85 Sta. Intersection Total 293 S.Y. Intersections 161 Tons <br /> 0 D Sta. 81+85 to Sta. 83+75 Lt. 1.90 Sta. <br /> 0 0 Total 481 S.Y. Driveways 263 Tons <br /> a r Sta. 86+40 to Sta. 87+20 Lt. 0.80 Sta. Pavement Repair 20 Tons <br /> m 0 Sta. 100+30 to Sta. 104+25 Lt. 3.95 Sta. P <br /> x Sta. 109+70 to Sta. 110+40 Lt. 0.70 Sta. Total 6,653 Tons <br /> Stu. 113+25 to Sta. 115+25 Lt. 2.00 Sta. <br /> Sta. 116+40 to Sta. 118+25 Lt. 1.85 Sta. <br /> �1 Sto. 119+80 to Sta. 127+85 Lt. 8.05 Sta. <br /> r- Sta. 131 +30 to Sta. 132+30 Lt. 1.00 Sta. <br /> M Sta. 133+95 to Sta. 137+05 Lt. 3.10 Sta. SHOULDER BAC K I N G <br /> 1" zSta. 139+10 to Sta. 141+50 Lt. 2.40 Sta. <br /> x Sto. 151+85 to Sta. 153+50 Lt. 1.65 Sta. Location QuantityPAVEMENT REINFORCING FABRIC <br /> Sta. 154+15 to Sta. 157+70 Lt. 3.55 Sta. Sta. 62+00 to Sta. 172+55 Rt. 1,416 Tons Location Quantity <br /> Sta. 168+55 to Sta. 172+05 Lt. 3.50 Sta. <br /> Sta. 170+20 to Sta. 172+15 Lt. 1.95 Sta. <br /> Sta. 62+50 to Sta. 172+30 29,280 S.Y. <br /> A Total 55.95 Sta. <br /> D <br /> M <br /> M <br /> .Z7 <br /> COUNTY OF SAN JOA UIN NO SCALE SUMMARY OF COPPEROPOLIS ROAD RESURFACING Sheet Na. <br /> Q QUANTITIES Alpine Road to Jack Tone Road 5 of 5 <br /> Drawn By Date Project Engineer Date Checked Date Submitted Date I viiroARecommended I Date <br /> 11/441s 1 Ae f <br /> IIAS IZ <br /> L _ <br />