My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP1250 - SP1254
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP0822 - SP1254
>
SP1250 - SP1254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 1:26:53 PM
Creation date
1/23/2016 12:14:17 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Hildreth Lane Resurfacing
Limits
No. 99 Frontage Rd. to Alhambra Ave.
Year
1994
Project Engineer
J. Stewart
Roads Worked
Hildreth Ln.
Red Lines
No
Supplemental fields
Classification
Improvement Plans
Cross Ref
SP1250 - SP1254
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. <br /> • Limits of Clearing and Grubbing <br /> and Earthwork Misc. Areas <br /> 4' 4' 10' 10' 4' <br /> LI 20' Pavement Reinforcing Fabric <br /> Conform _ Var. i Var. _ I Conform <br /> — Imported Borrow <br /> 0 <br /> .10'A.C. T �TYP ) <br /> Existing Roadway <br /> 0.25' Asphalt Concrete Overlay <br /> * Limits of Mailbox Relocation <br /> TYPICAL SECTION <br /> 6 m Sta. 0+50 to Sta. 47+00 <br /> 3 z <br /> N m <br /> M <br /> O .GENERAL NOTES <br /> 0 <br /> 1. Imported Borrow shall be cohesive material selected for 4. Pavement Reinforcing Fabric shall be placed between the <br /> M <br /> its ability to resist erosion. The R—Value requirement layers where the Asphalt Concrete overlay thickness is <br /> U shall be waived for this material. The Sand Equivalent greater than 0.17'. <br /> = for this material shall not have a value greater than 10. <br /> M 5. Survey Monument Frame and Cover located 5'f right of <br /> 2. All earthwork, except for final grading of the shoulders, Sta. 23+95t shall be adjusted to finished grade. Exact <br /> z shall be completed prior to placing finished course of location to be determined by the engineer. <br /> o Asphalt Concrete. <br /> 3. Placement of Asphalt Concrete Surfacing shall not begin <br /> until Asphalt Concrete used for Pavement Repair has <br /> o been in place for a minimum of 36 hours. <br /> z <br /> 0 <br /> M COUNTY OF SAN JOAQUIN No SCALE TYPICAL SECTION HILDRETH LANE RESURFACING Sheet No. <br /> No. 99 Frontage Rd. to Alhambra Ave. 2 of 5 <br /> Drawn By Date Project Engineer Dote Checked Date Submitted Date r va R ommended Date <br /> 6//4/93 kap V"%M I 6/isM �idAlZl�t� <br />
The URL can be used to link to this page
Your browser does not support the video tag.