Laserfiche WebLink
i <br /> ADJUST MANHOLE EARTHWORK <br /> FRAME AND COVER (Miscellaneous Areas) <br /> Location Quantity Location Quantity <br /> Sta. 0+45 1 Each Ste. 0+50 to Sta. 47+00 46.5 Sta. <br /> Sta. 8+72 1 Each <br /> Sta. 19+95 1 Each <br /> Sta. 24+05 1 Each <br /> Total 4 Each IMPORTED BORROW <br /> Location Quantity <br /> Sta. 0+50 to Sta. 47+00 236 C.Y. <br /> PAVEMENT REPAIR <br /> Location Quantity DRIVEWAYS <br /> 27 Sites throughout project 823 S.Y. <br /> Type Quantities <br /> No. Area <br /> PLANING ASPHALT °E 44 <br /> 185 S.Y. <br /> 4 887 S.Y. <br /> CONCRETE PAVEMENT <br /> m Location Quantity ASPHALT CONCRETE <br /> El <br /> zSto. 0+50 to Sta. 0+75 66 S.Y. (Type B) <br /> O <br /> D Sta. 46+75 to Sta. 47+00 67 S.Y. <br /> z rn <br /> Roadway Total 153 S.Y. Location Quantity <br /> a Roadways 1,953 Tons <br /> A <br /> Intersections Intersections 56 Tons <br /> Lloyd Lane 12 S.Y. <br /> M Driveways 118 Tons <br /> Maranon Drive 19 S.Y. Pavement Repair 333 Tons <br /> Jonathon Court 20 S.Y. <br /> = Hilary Lane 26 S.Y. Total 2,460 Tons <br /> Nm Hope Lane 26 S.Y. <br /> Nossono Drive 29 S.Y. <br /> Z <br /> Adahmor Drive 1S.Y. PAVEMENT REINFORCING FABRIC <br /> Alhambra Avenue 166 S.Y. <br /> x Intersection Total 158 S.Y. Location Quantity <br /> to Total 311 S.Y. <br /> Sta. 0+75 to Sta. 46+70 10,211 S.Y. <br /> O <br /> Z <br /> A COUNTY OF SAN JOAQUIN No SCALE SUMMARY OF QUANTITIES HILDRETH LANE RESURFACING Sheet No. <br /> No. 99 Frontage Rd. to Alhambra Ave. 5 of 5 <br /> �1 Drown By Date Project Engineer Date Checked Date Submitted Date r va R ommended Date <br /> C. D 6193 8� .# //sV93 v �tuSu 6/5/93 '/8 i Z/t¢ <br />