My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP0822 - SP0836
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP0822 - SP1254
>
SP0822 - SP0836
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:39:45 AM
Creation date
1/22/2016 11:55:02 PM
Metadata
Fields
Template:
Small Plans - SP
Project
East Stockton Streets Resurfacing - 1988
Year
1987
Project Engineer
Larry Violett
Roads Worked
Filbert St., Anteros Ave., Cardinal Ave., Fourth St.
Section Ave., Sinclair Ave.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP0822 - SP0836
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
GENERAL NOTES <br /> Const. <br /> 1 1. Asphalt Concrete used fbr pavement repair shall <br /> — Limits of Clearing and Orubbin9 be ploced in layers which do not exceed 0.50' in <br /> compacted Thickness. <br /> 1' 4' /?, — w 12' 4' /' <br /> 24'Pavement A'e;l?krc;nq /b&;c 2. Placement of Asphalt Concrete surfacing shall not <br /> begin until Asphalt Concrete used in povement <br /> /0.04'A.C.(Typ.) repoir hos been in place for a minimum of 3C hours. <br /> vow von Var _ gar 7 <br /> r forlhwork, if reauired, w1// be as oll s ted by the <br /> L _ __ _ _ _ _ _ _ ___ _ _ _ _ _ __ _ _ _ _ _ _ _ _ _ J �� Engineer. Poyment will be by Item No. 1, Force <br /> �+ <br /> � <br /> Ifxisth7g <br /> 0.17' Aspholt Concrete Overloy. Account. <br /> Roodwvy 4. Woter valve frames and covers will be adjusted <br /> to grade by Coliforn;a Wafer Service Co., after <br /> resurFoung is completed <br /> T YP/CAL SECT/ON <br /> East Main St. to Washington St. bq 5. Goo voframe and cover will od�usted to <br /> Ito. 0 f 26 to .Sta. ZO f 78 geode by P 6. and E. offer resurur facing rs <br /> 'a+ � comp/e tad. <br /> o � Z <br /> Construction <br /> E. P. h <br /> ti Nii i i M <br /> ANTEROS AVENUE m Z <br /> hto 2 27 26 o h0 <br /> ZZ k <br /> ,O = C LE6EN.0 25A.C. <br /> �o ■ L imits of Asphalt Concrete Povement Plooing. roes. o <br /> m y�o o.aoDepth of Asphalt Concrete Pavement P/orirng. <br /> v� V <br /> 40'A. C. Varioble Depth Aspholt Concrete Overlay, <br /> roes. <br /> $ R - Conform to t?xrstiny Radii <br /> m BEC7/NN/NO Of PROJECT PLAN END Of PPOZIECT <br /> > AN <br /> SEC <br /> w o COUNTY OF SAN JOAQUIN NO SCALE TYPAND PLAN ION easthlon sr to AVENUE <br /> o�,sb�ton st. -!L of 5 <br /> Drawn By I Dot• Project Engineer I Date Chocked Data Submitted I Dot. owl ecommended Dote <br /> S'- A"--7 `0/87 110187 -L� n t io/B� y/Iarwul ao4nir 1=h/07 f �v <br />
The URL can be used to link to this page
Your browser does not support the video tag.