My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SP0929 - SP0941
PublicWorks
>
VAULT MAPS
>
Small Plans - SP
>
SP0822 - SP1254
>
SP0929 - SP0941
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2024 9:48:28 AM
Creation date
1/23/2016 12:00:32 AM
Metadata
Fields
Template:
Small Plans - SP
Project
Front Street, Harney Lane, and Extension Road Resurfacing
Year
1989
Project Engineer
Larry Violett
Roads Worked
Front St., Harney Ln., Extension Rd.
Red Lines
Yes
Supplemental fields
Classification
Record Drawings
Cross Ref
SP0929 - SP0941
Type
Resurfacing
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Const. GENERAL NOTES <br /> Limits of Clearing & Grubbing 1. The Contractor shall notify Mr. Greg Carney of <br /> Stockton Terminal and Eastern Railroad Co. <br /> '24' Pavement Reinforcing Fabric (466-7001) 7 calender days prior to beginning <br /> 2' 10' ��� 12' 1.5't Conform to work on Front St. <br /> top of rail Attention is directed to Sec. 7-1.14 "Cooperation" <br /> and Sec. 8-1.10 "Utility and Non—Highway <br /> 0.04'A.0 Facilities" of the Standard Specifications. Stockton <br /> Var. Terminal and Eastern Railroad Co. will be raising <br /> l the rails across Duncan Rd. <br /> 7Backin <br /> � The Contractor shall remove and disposed vIexisting A.C. within 2' of the rails and repave area <br /> L------ — ----------- after railroad has adjusted rails. <br /> 0.17' Asphalt Payment for removing and replacing A.C. within <br /> Concrete OverlaExistingrails to2' of rails will be Item 1, Force Account. <br /> yExistin Roadwa Shoulder g remain in place. <br /> 9 y (See General Note #4) 2. Maintaining Traffic—Duncan Rd. may be closed to <br /> A. C. Molerio/ Used all traffic, for a maximum of i working day, during <br /> Sta. 9+00 to Sta. 41+50 adjustment of S.T. & E. R.R. Xing. <br /> 3. Placement fo Asphalt Concrete Surfacing <br /> '0'—Sta.33+15 to Sta. 35+15 q 5 . shall not begin until Asphalt Concrete used <br /> E.P. shall conform to lip of " ' t r"� x-§ ,, ^'' in Pavement Repair has been in lace for a <br /> MY " Ij. P P <br /> existing P.C.C. gutter. minimum of 36 hours. <br /> - S. Adios g/��gg 4. Asphalt Concrete shall be place in lieu of <br /> • 22'—Sts. 33+15 to Sta. 35+15 <br /> ,9 Shoulder Backing Material at the following <br /> locations: Stu. 13+00 to Sta. 17+15, Sta.24+25 <br /> to Sta. 24+60, Sta. 26+65 to Sta. 27+05, <br /> - Stu. 29+35 to Sta. 29+90, Sta. 33+75 to <br /> Const. Sta. 33+95, Sta. 34+95 to Sta. 35+55, <br /> Sta. 36+10 to Sta. 36+60, Sta. 37+80 to <br /> Sta. 38+20, and Sta. 39+90 to Sta. 41+50. <br /> 0Limits of Clearing and Grubbing <br /> D <br /> n <br /> D <br /> zr o 24' Pavement Reinforcing Fabric <br /> m <br /> 2 10' 10' 2' <br /> m <br /> � r= '0.04' A.C. <br /> D m (Typ.) Var. Var. <br /> fJ z The alignment of the south E.P. of Front St. <br /> (p 3 shall conform to the North rail of S.T. &.E. <br /> M ————————————— —————t———————————————J R.R. from Sta. 42+00 to Stu. 44+15. . ' " " . <br /> 0.17' Asphalt Concretes • The A.C. thickness at the E.P. shall vary <br /> from 0.04' to 0.17' and shall conform to <br /> Existing Roadway Overlay IU A y top of rail from Sta. 42+00 to Sto. 44+15 (Rt.) <br /> D <br /> b t and to existing A.C. from Sta. 42+50 to <br /> (Lt <br /> A <br /> Sta. 41+50 to Sta. 48+65 Sta. 44+40 .). <br /> COUNTY Uh' SAN JOAQUIN No SCALE TYPICAL SECTIONS FRDDunc STREET <br /> Ran dE to RESMarRFSACING St. zeoetlNo. <br /> Drawn By Date I Project Engineer I Date Checked Dote Subnittetl Dnte <br /> - wni A 7Gl roded Dnte <br /> 5. d4 4l S` <br /> sr <br />
The URL can be used to link to this page
Your browser does not support the video tag.