Laserfiche WebLink
ADJUST WATER VALVE SHOULDER BACKING <br /> FRAMES and COVERS Location Quantity <br /> Sta. 9+00 to Sta. 39+90 799 Tons <br /> Location Quantity <br /> Throughout project 4 Each <br /> ASPHALT CONCRETE <br /> (Type B) <br /> Location Quantity <br /> ADJUST MANHOLE <br /> Roadway <br /> FRAMES and COVERS Pavement Repair ''217 Tons <br /> Location Quantity Intersections 81 Tons <br /> Throughout project 19 Each Total 1,440 Tons <br /> PAVEMENT REINFORCING <br /> FABRIC <br /> PAVEMENT REPAIR Location Quantity <br /> Location Quantity Sta. 9+25 to Sta. 33+15 6,373 S.Y. <br /> Sta. 33+15 to Sta. 35+15 489 S.Y. <br /> 26 sites throughout project 595 S.Y. Sto. 35+15 to Sta. 48+40 3,533 S.Y. <br /> Total 10,395 S.Y. <br /> 0 <br /> � D <br /> wO <br /> D <br /> s O <br /> N PLANING ASPHALT <br /> CONCRETE PAVEMENT <br /> C m Location Quantity <br /> Sta. 9+00 to Sto. 9+15 40 S.Y. <br /> D Z Duncan Rd. 136 S.Y. <br /> mAlfalfa St., Ione St., - <br /> Harrison St. 25 S.Y. E . <br /> Sta. 33+15 to Sta. 35+30 (Lt.) 96 S.Y. <br /> Sta. 42+50 to Sta.44+40 507 S.Y. <br /> Market St. 68 S.Y S. Adioaq 9/-//By <br /> sSta. 48+50 to Sta. 48+65 50 S.Y. <br /> b E Total 922 S.Y. <br /> rn ' <br /> A <br /> P COUNTY OF SAN JOAQUIN NO SCALE CONSTRUCTION NOTES FRONT STREET RESURFACING sheet No. <br /> Duncan Rd, to Market St. 6 of 13 <br /> Dram Ry Datr I Project EnR!Wer Date hacked Date Submitted Dnte rov econnrnded Dnt <br /> 6 PT <br />