My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600778
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600778
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:50:40 AM
Creation date
3/29/2016 4:01:35 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600778
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
E/S FLOWER ST 52'N/O E MAIN ST
Application
PACIFIC GAS & ELECTRIC -STOCKTON
Supplemental fields
APN
PS-1600778
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
l-ll) <br />0::W3:o-ll.L. <br />g'~-.-..20'••••••11' <br />(J(CA'IATE (I)4',8'BfWW <br />10 R£PIJ,C[GIS 5£R'1£l: <br />T555552'1 <br />~~"5-~~E MAIN ST <br />SHEETS <br />REV. <br />co:SO: <br />IIOTlF: <br />OTHER: <br />SHT:1 Of I <br />PlI:3T167115 <br />5555 [IW:/ST <br />STOCKTON <br />GAS LINE REPLACEMENT <br />PACIFIC GAS AND ELECTRIC COMPANY <br />Flower St subject to pavement cuts shall receive an (1)-inch asphalt concrete overlay from the <br />centerline (or lane line)to the edge of the travelled way as per the San Joaquin County Trench <br />Cut Policy.If the pavement is disturbed on both sides of the centerline (or adjacent lane),then <br />the entire roadway (or affected lanes)shall be resurfaced.Contractor shall grind and overlay <br />within 10 working days of permanent trench paving.Shoulder areas shall be brought up to the <br />finish grade as directed by the County. <br />EST: <br />AOE:C0l8 <br />SUPV: <br />REP: <br />PLNR: <br />SCALE:1"=100'
The URL can be used to link to this page
Your browser does not support the video tag.