My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600697
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600697
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:50:29 AM
Creation date
3/29/2016 4:42:31 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600697
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
N/S OF ALMONDWOOD RD 632'E/O OLEANDER AV
Application
PACIFIC GAS & ELECTRIC -STOCKTON
Supplemental fields
APN
PS-1600697
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISfONi~J <br />W:inte.rWeatJierUtiIi~rWotIc <br />1.SUPERVISioN:The utility company (pe:rmittee)shall fuullsh fLJIl-:timesupervision of all work te insure.compliance with the Pfu'mitprovision. <br />z.ST)'..RT OF WORK:No workwithiu the County right-of-way shall be started.untiIllie utility company <br />representative has made an evaluation of weather conditi0ns and has determined the work can be ' <br />"accomplished mlder tlie provisions off he peJIDit. <br />3.CLEAN PAVEllffiNT:Dirt and mud s~a11not be deposited'Oll the pavement outside the area of work, <br />~nd :ifiuadver!ently tracked onto the rpad travel way shall b~removed in:rriJ£,diately. <br />4,DAILY RESTOR)"TION:'Private driveways 'and road intersections shall be,restoreddaily <br />5,W'EATIIER-TIGH'I'CONDITIONS,AU trenches sharI be filled and compacted,ditches and other <br />dminage facilities tegarded and opened,and the entue worle area restored to weather~tight coorn.tionprior to .anyr8ll1.
The URL can be used to link to this page
Your browser does not support the video tag.