My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600651
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600651
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:50:01 AM
Creation date
3/31/2016 11:56:19 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600651
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
S/S OF DANA AV 370'W/O CARDINAL AV
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1600651
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
••-. <br />('llyE"(,II;'r TJR r'TfI.5ItnN(J1--5 ~..ti.L.J.[u.'I )~'V i.::J <br />Winter Weather Utility Work <br />1.SUPERVIsioN:The utility company (permittee)shall funRsh full-time supervision of all work to insure,compliance with the pemiit provision, <br />2,ST/I-R'f OF WOP:1(:No Workwithin the County right-of-way shall be started_until the utility compaiW <br />representative has made an evaluation of weather conditi0:bBand has deteIJlunedfue work cao be '"accomplished llUderthe provisions of the peruni. <br />3.CLEAN PAVEIVLENT:Dirt and mud sl;1aIInot be deposited'oll the pavement outside the area of work, <br />and if inadvertently tracked onto the rpad travell'lay shall be removed irm:i:lecliately, <br />4,DAILY RESTORATION:-'Private driveways and road llltersections shall bexestored daily <br />5.VYEATHER-TIGHT CONDITIONS:All trenches shBlIbe filled and compacted,ditches and other <br />drainage facilities regarded and opened,and the entil-ework .area restored to weather~tight condition prior to .any ram.
The URL can be used to link to this page
Your browser does not support the video tag.