Laserfiche WebLink
w>« <br />z <br />If)zauIf) <br />3: <br />Pfl <br />EfP <br />efl <br />3301 <br />6' <br />t <br />29' <br />Euclid Avenue subject to pavement cuts shall <br />receive an (I)-inch asphalt concrete overlay from <br />the centerline (or lane line)to the edge of the <br />travelled way as per the San Joaquin County Trench <br />Cut Policy.If the pavement is disturbed on both <br />sides of the centerline (or adjacent lane),then the <br />entire roadway (or affected ianes)shall be resurfaced. <br />Contractor shall grind and overlay within 10 working <br />days of permanent trench paving.Shoulder areas <br />shali be brought up to the finish grade as directed by <br />the County. <br />EfP <br />Pfl <br />I .•385'••T <br />6' <br />EXCAVATE (1)4',4'BEtLHlJ(f <br />TO REPLICE GAS SEIMCE <br />W EUCLID <br />EST:IXCO <br />ADE:CD1.8 <br />SUPV: <br />REP: <br />PLNR: <br />SCALE:1'=100' <br />GAS SERVICE REPLACEMENT <br />3301 IV EUCUDAVE <br />STOCKTON <br />PACIFIC GAS AND ELECTRIC COMPANY <br />CO: <br />SD: <br />NOTIF: <br />OTHER: <br />SHT:1 OF 1 <br />PU:31218076 <br />SHEETS <br />REV,