My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600665
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600665
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:50:08 AM
Creation date
3/31/2016 11:57:15 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600665
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
S/S OF POLK WAY 372'E/O ALEXANDRIA PL
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1600665
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISfONS <br />Winter Weathe1 Utility Work <br />1.SUPERVISioN:.Theutility company (permittee)shall fuI}llShfuIl-time sUper=-visionof all work tGmSlrre.compliance with the peiriJitprovision. <br />2.STfi.J'RTOF WORK:No work within the County right-of-way shall be started lUltiIthe utility company <br />repIesentalive has made an evaluation of weather couditiens and 11M determined the work CaD be . <br />"accomplished under TIleprovisions of TIlepemuL <br />3.CLEAN PA'ilEMENT:Dirt and mnd sJ;tal1not be deposited on the pavement outside the area of work, <br />Bnd ifinadvertently tracked onto the rqad travel way shall be removed immedIately, <br />4.DAILY RESTORATION:.Private driveways and road intersections shall be.xestored daily. <br />5.VVEATHER-TIGHT CONDITIONS,All trenches shan be filled and compacted,ditches and other <br />cirainage facilities regarded and opened,anci the entiJ:ework area restoled to weafheFlight condItion plior to .anyxam <br />F;\l?I!lU,flTS COm)D3R\",~JlCOitipiOvi.1io ns\Wi.,(or 'We~lhuPnwisi on.'.40,;.'(
The URL can be used to link to this page
Your browser does not support the video tag.