Laserfiche WebLink
'.Turner Road subject to pavement cuts shall receive an <br />(1 )-inch asphalt concrete overlay from the centerline (or Lane <br />line)to the edeg of the travel way as per the San Joaquin <br />County Trench Cut Policy.If the pavement is disturbed on both <br />sides of the centerline (or adjacent lane),then the entire <br />roadway (or affected lanes)shall be resurfaced.Contractor <br />shall grind and overlay within 10 working days of permanent <br />trench paving.Shoulder areas shall be brought up to finish <br />grade as directed by the County. <br />I <br />I <br />I <br />wo <br />o0:: <br />(f) <br />W0:: <br />> <br />_J <br />IIV <br />IIV <br />1824' <br />TURNER RD. <br />3550 <br />W.TURNER <br />3' <br />EXCAVATE 4'x4' <br />FOR CUT OFF. <br />GAS MAIN 10' <br />15't .EOGE OF PAVEMENT50'----etli _ <br />3550 W.TURNER RD.CUT-OFF GAS SERVICE <br />LODI UNINC.-S.J.COUNTY <br />PACIFIC GAS AND ELECTRIC COMPANY <br />co:so: <br />NOTIF:111456165 <br />OTHER: <br />SHT:SHEETS <br />p~:REV.31226341