Laserfiche WebLink
... <br />If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />The resurfacing requirements shall be in addition'to County Stondord Drawing No. <br />R-29 .. <br />Resurfacing for 8ell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lane,only that area shall be resufaced as shown. <br />If cross'-cutting is performed on Local Roads at intervals less then 150'a SeQI <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing.Section 2-5.03 (8-2). <br />3. <br />4. <br />NOTES <br />1 <br />2. <br />fjI <br />u <br />C QJo+'~QJQJ~Lo~Ooc't:QJ 0:JcU <br />[f)0:'::(J>"<::0c~...c.-3=0.-t][f)'x Q)<CQJO,,- <br />c~0QJLC:J..<::o [f)0-QJc1L- <br />[Lw <br />(ellI.rF--n I <br />I I <br />IT~~~~:;:;;:; <br />0c%:;;,r%:;;I:;;/;/; <br />r - <br />°.t.,,~I I I .I'*',, <br />21 I II0z,, <br />QJI I 1 11IJii, <br />I I,,,, <br />0 ~ <br />:;;/;'l :/'",;::/; <br />I I I,, <br />I I I! <br />ra <br />.t.ra <br />.t. <br />Paved Shoulder-r1 <br />Approved by: <br />No.Revision Descri t10n Dote