Laserfiche WebLink
Olive Avenue subject to pavement cuts shall <br />receive an (1)-inch asphalt concrete overlay from <br />the centerline (or lane line)to the edge of the <br />travelled way as per the San Joaquin County Trench <br />Cut Poiicy.If the pavement is disturbed on both <br />sides of the centerline (or adjacent lane),then the <br />entire roadway (or affected lanes)shall be resurfaced. <br />Contractor shall grind and overlay within 10 working <br />days of permanent trench paving.Shoulder areas <br />shall be brought up to the finish grade as directed by <br />the County. <br />515 <br />S.OLIVE <br />•••50' <br />w>10'«I-Z <br />W w>:2w <br />--J ~0 0.. <br />lJ...0(f)W0<t 0w, <br />II9'----:, <br />6' <br />()<)------------- <br /><0~ <br />Z«:2 <br />(f) <br />O'«en 0.q- <br />EXCAVATE 4'x4'HOLE <br />-------------- <br />HORNER AVE. <br />----- <br />--l ,----------- <br />515 S.OLIVE AVE.INSTALL GAS SERVICE <br />STOCKTON UNINC.-S.J.COUNTY <br />PACIFIC GAS AND ELECTRIC COMPANY <br />co: <br />SD: <br />NOTlF:11367214 <br />OTHER: <br />SHT: <br />PM:31221388 <br />SHEETS <br />REV.