Laserfiche WebLink
r-------------~----'--------.-------.---------,.---.-.-..-..----------- <br />NOTES,. <br />1.If the distance between cross-cuts are less then 150'the entire area between <br />carss-cuts sholl be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements sholl be in addition'to County Standard Drawing No, <br />R-29,. <br />3,Resurfacing for Bell Holes shall meet these requirements,If excavation occurs within <br />the shoulder or lone,only that area shall be resufaced as shown, <br />4,If cross-cutting is performed on Local Roods at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing,Section 2-5.03 (B-2), <br />0-W <br />1 <br />,",i !, <br />I ,I <br />~;;;;,%;.c /0:;::~:;::;.c.~_z: <br />,,~I , <br />II~,,21 I II0z,, <br />OJI <br />I I 1IOJ,,Ul1 I II,,,:;:::;::~;;:-:;::;: <br />~;.c- <br />~I I I <br />i ,,I_.I <br />Ta <br />LTa <br />L <br />Ta <br />LTa <br />L <br />Paved Shoulder ~ <br />r0-w <br />..! <br />Approved by: <br />ja/Pr <br />No.Revision Descri Han Date