My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600661
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:50:05 AM
Creation date
4/7/2016 11:54:22 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600661
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
E/S OF FLOWER ST 52'N/O MAIN ST
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1600661
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS <br />V/inter Weallier Utility WOIk <br />1.SUPERVJi'SION:The utility cOinpany (pen:Ilittee)shall fumish fuil-:time supervision of all work to insure.compliance with the permit provision. <br />2.START OF WORI{:No work wrJJin the County right-of-way shall be startecl until the utility company <br />representative has made an evaluation of weather condiuens and has determined me wort::can be . <br />"accomplished under the provisions oHhe pemut. <br />3.CLEAN rAVEMEl'iT:Dirt and mud s~alI not be deposited 011 me pavement outside the area of work, <br />~d ifinadvertently tracked 01110 the rpad travel way shall b~removed iuDilBdiately. <br />4.DAIL 1(RESTORATIOI'{:'Private driveways and road intersections shall be.restored daily. <br />5.YI"EATHER-TIGHr CONDITIONS:All trenches sharI be filled and compacted,ditches and omer <br />drainage facilities regarded and opened,and the entire work area restored to 'weather~tight condition prior toanyraw..
The URL can be used to link to this page
Your browser does not support the video tag.