Laserfiche WebLink
PS-1600675 <br />SPECIAL CONDITIONS FOR <br />CALWATER -#8285 <br />ENCROACHMENT PERMIT <br />March 15.2016 <br />1.Maintain traffic controls for all roads.Traffic control delays shall not exceed 15.minutes. <br />Two-way traffic shall be maintained dUring non-working hours with excavated areas backfilled or <br />.plated.During working hours,two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br />2.Access to all properties shall be maintained at all times except when work is occurring at the <br />access point.Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall.be fully restored at the end of each workday.Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />3.Residents and businesses shall be notified in writing,as approved by the County,48 hours in <br />advance of any impacts to their access.. <br />4.Ar;y areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in adilance. <br />5.Existing fences shall not be removed without written consent of the property owner.Such consent <br />.shall be submitted to the County prior tottie removaL Fences removed shall be restored with in- <br />kind or better materials.Restored fences shall not encroach into County right-of-way. <br />6..Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Field Engineering Division, <br />contact them at 209-953-7421. <br />7.All destroyed or obliterated pavement markings must be replaced in kind by the permittee.Typical <br />pavement markings include but not limited to lane lines,centenines,stop and stop ahead <br />legends,limit lines,raised pavement markers and miscellaneous delineators. <br />8.The Permittee is'responsible for the preservation of survey monuments located within the area of <br />work herein permitted.Prior to ihe start of construction,survey monuments that potentially may <br />be disturbed shall be located and referenced by a Ucensed Land Surveyor,and a Comer Record <br />filed with the County Surveyor.Any Survey Monuments disturbed during the course of <br />construction shall be reestablished 'by a Licensed Land Surveyor and another Comer Record filed <br />with the County Surveyor.(Land Surveyors'Act Section 8771) <br />9.All pipe and pipeline related facilities including,but not limited to,valves,utility boxes and vaults, <br />and frames and covers shall be maintained by Cal Water,including any faCilities that are <br />abandoned in place ..Cal Water shall be responsible for any and all costs.associated with the <br />removal,relocation and/or adjustment Of the~e facilities as determined by the County at Cal <br />Water's expense.(Streets and Highways Code Section 1463). <br />10.All future maintenance of the pipeline and related facilities within the County right-of~way will <br />requ'ire a San Joaquin County Encroachment Permit ..