Laserfiche WebLink
NOTES <br />1 , <br />2, <br />3, <br />4, <br />If the distance between cross-cuts ore less then 150'the entire area between <br />corss-cuts sholl be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />The resurfacing requirements shall be in addition'to County Standard Drawing No. <br />R-29 .. <br />Resurfacing for Bell Holes shall meet these requirements,If excavation occurs within <br />the shoulder or lane,only that area shall be resufaced as shown, <br />If cross'-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing,Section 2-5,03 (B-2). <br />Paved Shoulder----rl <br />o <br />.L'Iai <br />To <br />.L'Ia <br />.L <br />.- <br />,,~I , <br />II~,,21 I <br />IIaz', <br />OJI <br />I IIOJ,,([)I I II,,• <br />1 <br />0-W <br />No Revision Oeserf Han Date <br />Approved by:TlRlfE~~1hj~[jJnIT~(GjtP(nIT~V.~1Rl~$$(GlUJn~!\lJ(Gj~fF <br />~(Q)IlJJ!\lJlJ'1r IRl(i])ffi:\lDJ\W AV$ <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />O'Jte:MAY2015 Std,Dwg,~Io,