Laserfiche WebLink
._----.._---------------_. <br />NOTES: <br />1. <br />2. <br />3. <br />4. <br />If the distance between crass-cuts are less then 150'the entire area between <br />corss~cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />The resurfacing requirements shall be in addition'to County Standard Drawing No. <br />R-29. <br />Resurfacing for Bell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lane,only that area shall be resufoced as shown. <br />If cross-cutting is performed on Local Roods at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing.Section 2-5.03 (B-2). <br />~I <br />['I i Iw, <br />I I IT~J%%;;;;:;~ <br />0 ;;:;/:: <br />L ;;;;;;/:: <br />Ta ;;;L :;;;L,,~I I II~,,21 I IIaz',, <br />"I I I lI",,UJ1 I I wI,, <br />0~ <br />I I <br />i i i <br />T <br />LTa <br />L <br />Paved Shoulder--t"1 <br />, <br />..I <br />No.Revision Oeseri tion Date <br />Approved by: <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Date:MAY 2015 Std.Dwg.No.