My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600464
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600000 thru PS-1600500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600464
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:46:00 AM
Creation date
4/14/2016 2:42:00 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600464
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600000 thru PS-1600500
Year2
2016
Address
S/S OF MINER AVE 82' E/O ANTEROS AVE
Application
CALIFORNIA WATER SERVICE
Supplemental fields
APN
PS-1600464
Cross Ref
PWP730077
Type (2)
Encroachment Permit (EP)
Zip
95205
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
....IU <br />,--;,.J '~~~st----oJ.rnC.~l\ <br />~-5 ~ <br />D~~:-6VJ;- <br />(Y1 <br /><b <br />S<:--x: <br />\Jl <br />~<::-'"'"ro E:;;'">-ro0a. <br />-'"-u 0ro'""'"""0w <br />-v, <br />O~ <br />.~ <br />~<::'"E'">roa.-o'""""0w <br />>'i <br />\i <br />-:::r->t ~ <br />~ <br />-'"ro:;; <br />"0 <br />-'"uro'" <br />~o <br /><t::s;::...\-~'-<:)\/)?\El> <br />Miner Avenue subject to pavement cuts shall receive an (l)-inch asphalt concrete overlay from the <br />centerline (or lane line)to the edge of the travelled way as per the San Joaquin County Trench Cut <br />Policy.If the pavement is disturbed on both sides of the centerline (or adjacent lane),then the entire <br />roadway (or affected lanes)shall be resurfaced.Contractor shall grind and overlay within 10 working <br />days of permanent trench paving.Shoulder areas shall be brought up to the finish grade as directed by I <br />the County.
The URL can be used to link to this page
Your browser does not support the video tag.