Laserfiche WebLink
Special Conditions for <br />ENCROACHMENT PERMIT <br />-2- <br />11.The contractor shall use San Joaquin County Standard R-29 when backfilling bell hole within the <br />County right-of-way.Where the existing road structural section is below standard,a minimum <br />section of 3 inches of asphalt concrete over 8 inches of aggregate base shall be required. <br />12.Chronicle Avenue subject to pavement cuts shall receive a (1)-inch asphalt concrete overlay as <br />per San Joaquin County Improvement Standards Section 2-5.0 Trench Cut Policy.Shoulder <br />areas shall be brought up to the finish grade as directed by the County. <br />13.Final paving for trench repair or rmid resurfacing shall be per Caltrans'specifications and shall <br />not occur between November 1 and March 31,without prior authorization from the San Joaquin <br />County Field Engineering Division,contact them at 209-953-7421. <br />14.No paving joints are allowed within paved shoulder;contractor shall pave all the way to outer <br />edge of paved shoulder. <br />15.Class II Aggregate Base shoulder backing is required from the edge of pavement,a minimum of <br />4-inches thick by 4-feet wide. <br />16.Contractor shall establish existing roadway and drainage grades within the construction area. <br />Any repair to roadways and adjacent areas shall match existing grades.Any proposed grade <br />changes shall receive prior approval from County. <br />17.County roads shall be kept clean from mud and debris at all times along the access points and <br />work zone areas during entire project.All standard roadway striping and signage shall be clearly <br />visible,maintained and restored throughout the construction zone during and after the project. <br />18.In addition to standard dust control measures,streets shall be maintained in a clean condition, <br />free of dirt,mud and debris during construction activities.The contractor shall provide daily,or as <br />needed,street sweeping using a modern mechanical or vacuum-assisted street sWeeper. <br />19.The contractor shall not conduct construction operations in rain or heavy fog conditions.