My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600471
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600000 thru PS-1600500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600471
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:46:02 AM
Creation date
4/14/2016 2:43:02 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600471
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600000 thru PS-1600500
Year2
2016
Address
W/S OF COOLIDGE AVE 625' N/O HORNER AVE
Application
CALIFORNIA WATER SERVICE
Supplemental fields
APN
PS-1600471
City
STOCKTON
CrossRef
PWP730077
Type (2)
Encroachment Permit (EP)
Zip
95205
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
PS-1600471 <br />SPECIAL CONDITIONS FOR <br />COOLIDGE AVENUE -#8283 <br />ENCROACHMENT PERMIT <br />February 29,2016 <br />1.Maintain traffic controls for all roads.Traffic control delays shall not .exceed 15 minutes. <br />TiNo-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated.During working hours,two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br />2.Access to all properties shall be maintained at all times except when work is occurring at the <br />access point.Minimal delays will be allowed to provide acce~s within the work zone area. <br />Driveway access shall be fully restored at the end of each workday.Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />3.Residents and businesses shall be notified in writing,as approved by the County,48 hours in <br />advance of any impacts to their access.. <br />4.Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />5.Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31.without prior authorization from the San Joaquin County Field Engineering Division, <br />contact them at 209-953-7421. <br />6.All destroyed or obliterated pavement markings must be replaced in kind by the permittee.Typical <br />pavement markings include but not limited to lane lines,centerlines,stop and stop ahead <br />legends,limit lines,raised pavement markers and miscellaneous delineators. <br />7.The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted.Prior to the start of construction,survey monuments that pote'ntially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor,and a Corner Record <br />filed with the County Surveyor.Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor.(Land Surveyors'Act Section 8771) <br />8.All pipe and pipeline related facilities including,but not limited to,valves,utility boxes and vaults, <br />and frames and covers shall be maintained by Cal Water,including any facilities that are <br />abandoned in place.Cal Water shall be responsible for any and all costs associated with the <br />removal,relocation and/or adjustment of these facilities as determined by the County at Cal <br />Water's expense.(Streets and Highways Code Section 1463) <br />9.All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br />10.Bellhole shall be completely backfilled or shored and plated at the end of each workday,andthe <br />roadway restored to two-way traffic.If plating is to be used,a trench shoring and plating plan <br />suitable for traffic loadings shall be prepared by a registered civil engineer and submitted for prior <br />approval by the County.
The URL can be used to link to this page
Your browser does not support the video tag.