My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600475
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600000 thru PS-1600500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600475
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:46:03 AM
Creation date
4/14/2016 2:43:13 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600475
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600000 thru PS-1600500
Year2
2016
Address
BEATRICE AVE NORTH OF POPLAR ST
Application
CALIFORNIA WATER SERVICE
Supplemental fields
APN
PS-1600475
Cross Ref
PWP730077
CrossRef
PWP730077
Type (2)
Encroachment Permit (EP)
Zip
95205
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
California MUTCD 2014 Edition <br />(FHWA's MUTCD 2009 Edition.including Revisions I &2,as amended for use in California) <br />Page 1117 <br />Tab~a6F-101{CA).Mmcimtim Spacinq of Channelizing Devices <br />~.S~J Maximum Channelizing Devices Spacing <br />(m~h)Taper'Tangent Conflict" <br />(feel)(feet)(feel) <br />20 20 40 =f1'25 25 50 12 <br />30 30 60 15f---- <br />35 35 70 17 <br />40 40 80 20 <br />45 45 90 22 <br />50 50 100 25 <br />55 50 100 25 ---60 50 100 25 <br />65 50 100 25 ---70 50 100 25 <br />75 50 100 25 , <br />,Maximum channelizing device spacing for all speeds on one-Iane/two-way tapers is <br />20 feet. <br />Maximum channelizing device spacing for all speeds on downstream tapers is 20 <br />feet. <br />All other tapers are as shown. <br />••Use on intermediate and short-term projects for taper and tangent sections where <br />there are no pavement'markings or where there is a connict between existing <br />pavement markings and channelizing devices. <br />Chapter 6F -Temporary Traffic Control Zone Devices <br />Part 6 -Temporary Traffic Confrol November 7,2014 <br />~ <br />11 <br />D <br />D <br />D <br />o <br />P
The URL can be used to link to this page
Your browser does not support the video tag.