Laserfiche WebLink
10"Min10"10"Min10"Min <br />See Note 1 Below <br />Existing <br />6"Min---j Povement t--6"Min <br />(Typ).(Typ)T ",;:.~~.;~i;.::.'<;;.~',(.,!,:;.;:."::.:",,i '~:;'>';':~ee Note 2 Below;"'";'".:'~..,;:",,"'.:~:::.;".:,'.<i:;'.;"":>;.i.;, <br />3'-0"~;;Compoct in 12"moxH'~loyers to 0 min relotive~========,«compaction of 95%o --------'>under pavement and <br />Vor ~~90%outside pavement.U~/<-~,"C t'24")-ompoc In mox <br />"-~layers to a min relative <br />00/2 ~~compaction of 85%."-.'."7 Compoct in 6"loyersto0minrelotive <br />compaction of 90%. <br />00+20"Min 00+20"Min <br />RIGID CONDUIT FLEXIBLE CONDUIT <br />NOTES: <br />1.New pavement shall be 1"thicker than existing pavement,minimum <br />of 0.25 Ft.New base shall be 1"thicker than existing base,min of 0.50 Ft. <br />2.Select native material or imported granular material as approved by the Director <br />of Public Works.Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3.Relative compaction of materials sholl be tested in accordance with <br />the State of California,Dept.of Transportation Testing Manuals,test <br />method No.California 216 or 231. <br />4.All existing pavement shall be neatly cut to line prior to trench excavation. <br />5.Jetting or ponding will be permitted within the street right-of-way with <br />a 3 year bond,when approved by the Director of Public Works. <br />6.When shown by soil composition and compactability,ninety percent (90%) <br />compaction may be used,when approved by the Director of Public Works. <br />7.Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Approved by: <br />No.Revision Descri tion Dete <br />TYIPCAL TRENCH BACKFILL <br />R-29 <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Dote:DEC 2014 Std,Dwg.No.Working for YOU