My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600477
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600000 thru PS-1600500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600477
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:46:04 AM
Creation date
4/14/2016 2:43:24 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600477
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600000 thru PS-1600500
Year2
2016
Address
S/S EUCLID AV (MARINE TO MARGARET)
Application
CALIFORNIA WATER SERVICE
Supplemental fields
APN
PS-1600477
Cross Ref
PWP730077
Type (2)
Encroachment Permit (EP)
Zip
95205
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVIS.IONS.,.'.......:" <br />Winter Weather Utility Work <br />.'.' <br />1.SlJPERVISION:.The utility c6mpalfy (perplitte.e)s4all furnisn fuli"timi:supervisiori of all work to rnsl:II"e <br />.compliance with the permit provision.'.......".".I... <br />2.START OF WORK:No work within the'County.right-of-way shall be started until the utility company <br />representative has made an (lva1uationof weather'conditions and has determined the work can be . <br />"accomplished under the provisions of the'permit.. <br />3.CLEAN PAVEMENT:'Dirt and mud sl;ml1no:tbe d~p~;it~'on the pavement outside the area of work, <br />and ifinadverten~y trackedonto ..theIoad tr;l.,,~l~a:{~hall be removed in;miediafely.. <br />4.DAll,Y RESTORATION:'Pri~ate drfveways:aD.ci-toadintersections shall be restored daily. <br />5.WEATHER-TIGRTCONDmONS:.'All:b;enches shiill beiilled and cdmpaeted,.ditches and other . <br />drainage facilities regarded and opened.,and the enUr(l work area restored to'weather-tight condition-prior to '. <br />any rain..'.'.'.:.'::.,".... <br />'.'.''.,"',' <br />.---- <br />'.:'.. <br />.' <br />"..:"'. <br />"." <br />.',.:':."..;.':.''. <br />..•.. <br />.... <br />,. <br />.."
The URL can be used to link to this page
Your browser does not support the video tag.