Laserfiche WebLink
PS-1600477 <br />.SPECIAL CONDITIONS FOR <br />ENCROACHMENT PERMIT <br />March 1.2016_ <br />1.Maintain traffic controls for all roads.Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated.During working hours;two-way traffic control shall be maintained with one lane open and <br />appropriate f1aggers.The contractor shall submit traffic control plans for all signing,detours,and <br />any lane closure impacting County right-of-way.Traffic control plans shall be submitted two <br />weeks prior to the closure date. <br />2.Access to all properties shall be maintained at all times except when work is occurring at the <br />access point.Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday.Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials. <br />3.Residents and businesses shall be notified in writing,as approved by the County,48 hours in <br />advance of any impacts to their access. <br />4.Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />5.Existing fences shall not be removed without written consent of the property owner.Such consent <br />shall be submitted.to the County prior to the removal.Fences removed shall be restored with in- <br />kind or better materials.Restored fences shall not encroach into County right-of-way. <br />6.Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Field Engineering Division, <br />contact them at 209-953-7421. <br />7.All destroyed or obliterated pavement markings must be replaced in kind by the permittee.Typical <br />pavement markings include but not limited to lane lines,centerlines,stop and stop ahead <br />legends,limit lines,raised pavement markers and miscellaneous delineators. <br />8.The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted.Prior to the start of construction,survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor,and a Corner Record <br />filed with the County Surveyor.Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor.(Land Surveyors'Act Section 8771) <br />9.All pipe and pipeline related facilities including,but not limited to,valves,utility boxes and vaults, <br />and frames and covers shall be maintained by California Water Service,including any facilities <br />that are abandoned in place.California Water Service shall be responsible for any and all costs <br />associated with the removal,relocation and/or adjustment of these facilities as determined by the <br />County at California Water SerVice's expense.(Streets and Highways Code Section 1463) <br />10.All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit.