Laserfiche WebLink
California MUTCD 2014 Edition <br />(FHWA's MUTCD 2009 Edition,induding Revisions 1 &2,as amended for use in California)Page 1117 <br />Table 6f-101(CA),MlJximlim Soacil1Cj of Channelizil1(j Devices, <br />Speed Mallimum Channelizing Devices Sp~cing <br />(mph)Taper'Tangent Conflict"(feel)(feet)(feel) <br />20 20 40 10 ]205 25 50 121-.30 30 60 15 <br />305 35 70 <br />~ <br />40 40 80 201--45 45 90 22 <br />50 50 100 25 <br />55 50 100 25 <br />60 50 100 25 <br />65 50 100 25 <br />70 50 100 25 <br />75 SO 100 25 <br />,Maximum channelizing device spacing for all speeds on one.laneitwo.way tapers is20feet. <br />Maximum channelizing device spacing for all speeds on downstreiim tapers is 20feet. <br />All other tapers are as shown. <br />"Use on intermediate and short.term projects for taper and tangent sections where <br />there are no pavement markings or where there is a conflict between existing <br />pavement markings and channelizing devices. <br />Chapter 6F -Temporary Traffic Controi Zone Devices <br />Part 6 -Temporary Traffic Control November 7,2014 <br />fi <br />o <br />m