Laserfiche WebLink
coP STEWART <br />2193 N <br />FUNSTON <br />5' <br />8' <br />F <br />U <br />N <br />S <br />T <br />o <br />N <br />Alpine Avenue subject to pavement cuts shall receive an (1)-inch asphalt concrete overlay from the <br />centerline (or lane line)to the edge of the travelled way as per the San Joaquin County Trench Cut <br />Policy.If the pavement is disturbed on both sides of the centerline (or adjacent lane),then the entire <br />roadway (or affected lanes)shall be resurfaced.Contractor shall grind and overlay within 10 working <br />days of permanent trench paving.Shoulder areas shall be brought up to the finish grade as directed by <br />the County.