Laserfiche WebLink
NOTES: <br />1. <br />2. <br />3. <br />4. <br />If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />The resurfacing requirements shall be in addition to County Standard Drawing No.R-29. <br />Resurfacing for Bell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lane,only that area sholl be resufaced as shown. <br />If cross-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing.Section 2-5.03 (B-2). <br />8'IIT <br />I 'I <br />Paved Shoulder I--J <br />~ <br />0-W <br />II«;oiTI~ <br />Tot~I~ <br />1, <br />I <br />,~I'*',210,~I"',U11 <br />, <br />, <br />I <br />III <br />, <br />I <br />"D <br />C <br />o '"..., <br />~(]) <br />'"~Lu~Uoc <br />'t:'"0"cu(J)0 ..., <br />01-C "0c;t:'..£:=+:J:5:o..(J)(J).x Q)«"'u0"- <br />'"'t:0c".o(J).I::j~'~ <br />f <br />~w <br />-.i"l~'tu <br />...,(J).-(J)E2~o <br />No.1 Revision Description I Date <br />Approved by:jalftr~~ <br />~Working for YOU <br />TRENCH CUTTING POLICYCROSSCUTTINGOFCOUNTYROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />~1-Da-te-:-M-A-Y-2-01-5Istd.Dwg.No.R-36