My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600482
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600000 thru PS-1600500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600000 thru PS-1600500_ - PS-1600482
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:46:06 AM
Creation date
4/14/2016 2:44:07 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600482
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600000 thru PS-1600500
Year2
2016
Address
W/S OLIVE AVE 45O' N/O HORNER
Application
CALIFORNIA WATER SERVICE
Supplemental fields
APN
PS-1600482
Cross Ref
PWP730077
Type (2)
Encroachment Permit (EP)
Zip
95205
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
REQUIRED MEASUREMENTS: <br />1.RlGHT OF WAY (EDGE OF PAVEMENT,FACE OF CURB,ETC.) <br />2.CENTER LINE (EDGE OF PAVEMENT,FACE OF CURB,ETC.) <br />3.OUR FACILITIES TO NEAREST EDGE <br />4.STREET CUT TO CLOSEST X-5TREET <br />:!J <br />:II ~. <br />3'~~a.D5},r-.::::m <br />"~iT] <br />I <br />30'-:;;."'- <br />I-1----------------1'1 <br />1..\50' <br />HORNER A\JE <br />BELL 'MOLE '. <br />The excavation,construction;anc!/or otherwise encroachme.nt will take place on Highway Rig~~~.::.W~the\NESY side of ()U\lE A\{E approximately ~i1e <br />\lOR\I-\of'HORMER EWt. <br />Olive Avenue subject to pavement cuts shall receive an (1).inch asphalt concrete overlay from the <br />centerline (or lane line)to the edge of the traveiled way as per the San Joaquin County Trench Cut. <br />Policy.If the pavement is disturbed on both sides of the centerline (or adjacent lane),then the entire <br />roadway (or affected lanes)shall be resurfaced.Contractor shall grind and overlay within 10 working <br />days of permanent trench paving.Shoulder areas shall bebrought up to the finish grade as directed by <br />the County.
The URL can be used to link to this page
Your browser does not support the video tag.