Laserfiche WebLink
NOTES: <br />1.If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements shall be in addition to County Standard Drowing No.R-29. <br />3.Resurfacing for Bell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lane,only that orea shall be resufaced as shown. <br />4.If cross-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing.Section 2-5.03 (B-2). <br />t <br />uCo QJ~QJ~QJ~'-u~UoC't:Q)a::lco",0 ~ <br />(J"l.co0~-5."'"'.x Q)« <br />IDg4- <br />QJ't0C::l.<:.2 (f)UJ~.~ <br />J. <br />f:;'00~"'.-(J)E2:.:Ju <br />0..W <br />(=lJI. <br />~ii ! <br />16!i !~I I I <br />QJ,I ,IIenIII,I , <br />,I ,I I <br />0..W <br />Paved Shoulder I--J <br />Approved by: <br />No.1 Revision Description I Date <br />JWPr <br />R-36 <br />TRENCH CUTTING POLICYCROSSCUTTINGOFCOUNTYROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />Dale:MAY 20151Std.Dwg.No.Working for YOU