Laserfiche WebLink
NOTES: <br />1.If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be ploned and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements shall be in addition to County Standard Drawing No.R-29. <br />3.Resurfacing for Bell t10les shall meet these requil"ements.If excavation occurs within <br />the,shoulder or lane,only that area shall be resufaced as shown. <br />4.If cross-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing.Section 2-5.03 (B-2). <br />t <br />-0 <br />Co CD+-'~CDCD~•••.u~UoC'tCDO::JCO000+-'",..c 0c:t::..c <br />=';:;$0..00 00'x 0)«a>g __ <br />CD't 0C::J..cj..'2 gj g•....- <br />0-W <br />(3JII <br />ii,I I <br />~!i i2)I I~,I I~!i i <br />!i I, <br />0-W <br />Paved Shoulder I--J <br />-i <br />t:;'loO <br />+-,00.-00Ee~u <br />No.1 Revision Description I Date <br />Approved by: <br />j(JJPr <br />R-36 <br />TRENCH CUTIING POLICYCROSSCUTIINGOFCOUNTYROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />-Oa-te-:-M-AY-ZO-1-5istd.Dwg.No.Working for YOU