Laserfiche WebLink
t <br />GENERAL PROVISIONS <br />GOVERNING INSTALLATION OF SUBSURFACE STRUCTURES AND PIPELINES WITHIN COUNTY ROAD-RIGHTS-OF-WAY <br />PUBLIC CONVENIENCE AND SAFETY: <br />A Before obstructing any private driveway entrance or County road traveled way with a trench,spoil bank,equipment orother barrier permitted for anyprolonged-period oftime,the Permittee shall notify the known users ofthe respective thoroughfare(s)involved,and shall provide access for vehicular andpedestriantraffictoandfromtheroad. <br />1. Unless otherwise permitted,all work shall be conducted in such amanner that no less than one lane ofthe existing County road traveled way willbemaintainedopentopublictrafficduringworkinghoursinasmoothandsaferidingcondition(s). Two lanes shall be open after working hours.2. In cases where road closure is permitted,the permission to close the road will be granted under the condition that the Permittee notify thefollowingpersonsand/or agencies ofthe time,the period ofclosure,and-the detour route at least twenty-four(24)hours priorto said road closure.a The County of San Joaquin Public Works Department d. The Iocal fire district <br />b. The County ofSan Joaquin Sheriffs Office e. The local school district <br />C. The local postal service The local residents involvedB. Should hazardous conditions relative to the installation operations warrant flagmen,as many capable flagmen as may be necessary shall be provided-by thePermitteeandstationedinadvanceofworktowarnanddirecttraffic. <br />C. Lights,signs and barricades shall be famished,erected and maintained by the Permittee for the adequate warning and convenience ofthe public,Withparticularattentiontobetakeninthisregardafterdark <br />D.. Any excess dirt and/or debris which might be a hazard to either automobile of pedestrian traffic,uncontrollable by lights,signs and barricades,shall beremovedfromthejobsitedaily. <br />STRUCTURES:. <br />A. Walls ofstructures shall be such quality and strength that they will resist all pressures and will not crack or be deformed in such a way as to create a hazardormaintenanceproblematanytime. Therefore,the minimum structural requirements for concrete pipe placed under county road rights-of-way shallconformtothefollowingAmericanAssociationofStateHighwayandtransportationOfficials(AASHTO)designations.1. For concrete pipe up to and including thirty-three inches(33")insidediameter,extra strength concrete conforming to AASHTO Designation M170M. <br />2. For concrete pipe thirty-six inches(36")inside diameter and larger,reinforced concrete pipe conforming to AASHTO Designation M 170M ClassIII. <br />3. Plastic pipe conforming to AASHTO Designation M294. <br />B. All concrete pipe joints with Countyroad rights-of-way shall be sealed against leakage and/minfiltration with rubber gasket in conformance with Section65-1:06 ofthe California Standard Specifications,or with other methods as may be permitted under the Special Provisions.C. Cast-in-place concrete pipe,vitrified clay pipe,spiral welded steel pipe,or corrugated aluminum alloy pipe shall not be installed within the County roadrights-of-way unless specifically so stated in the Special Provisions,and only under the conditions as provided. <br />D: All structures to be buried within the County rights-of-way shall be set at such elevations as to allow minimum coverage of thirty inches(30")to thecenterlineoftheroadwaysandtwelveinches(12")at the bottoms of borrow ditches each side ofthe roadways. The depths ofstructures shall be establishedbelowaflatplaneextendingacrosstherights-of-way,no part ofwhich shall extend above the elevations stated above;manholes,lampholes,valves,etc.notincluded. Future surface elevations shall be anticipated as nearly as possible and structure elevations shall be established for future adjustments accordingly.E. The County hereby reserves the rightto specify in the Special Provisions the gage and surface treatment of any galvanized corrugated metal pipe that-is to beinstalled. <br />F. All longitudinal utility facilities are to be established(and dimensioned on sketches)from surveyed centerline ofroad right-of-way,not from right-of-wayborder)lines. <br />REPAIRS OF THE COUNTY RIGHT-OF-WAY: <br />A All excavations shall be backfilled and compacted immediately after work therein has been completed.B. Trenched shall not be left open farther than 300 feet in advance ofpipe laying operations,or 200 feet to the rear thereof,unless otherwise permitted by theEngineer. <br />C. Unless otherwise permitted under the Special Provisions,backfill shall be placed and mechanically compacted in'such a manner that the relative compactionthroughouttheentirefillwithintheCountyroadright-of-way shall conform to the percentages ofcompaction as shown on the Trench detail.D. Backfill material shall be placed in horizontal uniform layers notto exceed in thickness,before compaction,0.67 foot in the bedding region,one—foot where90%compaction is required,and two-feet where 80%compaction is required. <br />E. No portion ofthe excavation(s)shall-be compacted by ponding orjetting unless a maintenance bond is provided.F. Gravel backfill material shall be utilized only where specifically so stated on the face ofthe permit It shall be compacted by means of ahigh-frequencyinternalvibrator,the compactor to be a size and type approved by the Engineer. Points ofcompaction shall not be greaterthan 18"centers and to the fulldepthofthelift <br />G. All pavements,curbs,gutters,sidewalks,borrow ditches,pipes,head walls,road signs,trees,shrubbery,and/or other permanent road facilities impaired byorasaresultofconstructionoperationsattheconstructionsite(s)occupied by materials and/or equipment,shall be restored immediately upon backfilling oftheexcavationtotheoriginalgradesandcrosssections,and to a condition as good as,or better than existing prior to construction.H. All surfacing materials ofroadways and driveway approaches cut or damaged by or as a result ofconstruction.operations,shall be replaced within ONEWEEKfollowingthebackfillingofexcavation,weather permitting,with compacted layers of surfacing materials at least as thick as the existing,and no lessthantwoinches(2")of asphalt concrete over six inches(6")ofaggregate base,both as specified below. <br />L Asphalt Concrete:Combined mineral aggregate shall conform to the quality and gradation requirements for'Type`B"-one-half inch(12) <br />maximum aggregate,coarse or medium gradation as specified in Section 39 ofthe California Standard Specifications. The bituminous binder tobemixedwithmineralaggregateshallbepavingasphalthaving(Grade PG 64-10),unless otherwise directed by the Engineer. Placement ofasphaltconcretesurfacingshallconformtotheapplicableprovisionsofSection39oftheCaliforniaStandardSpecifications.2. Aggregate Base: Combined mineral aggregates shall conform to the quality and the grading for three-quarter inch(3/4")maximum sizeaggregateClass2AggregateBasespecifiedinSection26oftheCaliforniaStandardSpecifications.L Before acceptance of repairs to the County road rights-of-way,all unsightly and detrimental dirt,dust and/or debris shall beremoved and the constructionareasleftinaneatandpresentablecondition(s). <br />1. Ifnecessary,County road traveled way and driveway pavements shall be washed with water to remove dirt and dust2. Driveway approaches and field entrance pavements damaged by equipment or spoil banks shall be repaired as directed by the Engineer.J. Upon request bythe County,any settlement,sagging ofsurface,or cracking ofpavement shall be repaired immediately by and at the sole expense ofthePermitteeforaperiodofoneyearfollowingacceptanceofthework <br />FA\PERMITS COUNTEMgeneral provision\inter Weather Provisions.docx