Laserfiche WebLink
If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />the resurfacing requirements shall be in addition'to County Standard Drawing No.R-29 .. <br />Resurfacing fOI'Bell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lane,only that area shall be resufaced as shown. <br />If cross-cutting is performed on Local Roads at intervals less then 150'a SeOI <br />Coat for thot half of the roadway containing the trench can be used in lieu of <br />resurfacing.Section 2-5.03 (B-2). <br />2. <br />3. <br />4. <br />NOTES: <br />1. <br />1 <br />0..W <br />eo;JI <br />r !i ! <br />I I I/: <br />~~;;;%~/:0':;:;;;;:%:%~ <br />••7: <br />,:,,-I '/I"ft",21 I II0z', <br />OJI <br />,II(1),,(/)1 I II,,r; <br />!I JJ-'I i <br />Ta <br />1.TaI <br />oT <br />1.Ta <br />1. <br />Paved Shoulder 14 <br />r0..w <br />,.' <br />Date <br />Approved by: <br />No.Revision Descri tion <br />T lRlJEi\ij~fFll ~[jJj1TlTll ~lGl P (()J U ~11.~!Rl(()J$$tGllBTrlTllil\!JrGJ(()JIF <br />(G(()J [lll~lT1f 1Rl(())~IDJ\'lffA 11$ <br />COUNTY OF SAN JOAQUnV <br />DEPARTMENTOFPUBUCWORKS ' <br />.._.......•........._...c_..............•.........•.•••.....J..o-.-,"'-'0 :-M-.~-Vj-2-:9.-2-".s,t~~~~~~.~o:..._.~:..~..~..