Laserfiche WebLink
California MUTeD 2014 Edition <br />(FHWA's MUTCD 2009 Edition,including Revisions 1 &2,as amended for nse in Califomia) <br />Table 6H-4(CA).Taper Length Criteria for Temporary Traffic Control Zones <br />(for 12 feet Offset Width) <br />Page 11il7 <br />Minimum Taper Length" <br />Speed'for Width of Offset 12 feet (W) <br />S Merging Shifting Shoulder Down(mph)L U2 U3 Stream <br />(feet)(feet)(feet)(feet)'*' <br />20 80 40 27 50 <br />25 125 63 42 50 <br />30 180 90 60 50 <br />35 245 123 82 50 <br />40 320 160 107 50 <br />45 540 270 180 50 <br />50 600 300 200 50 <br />55 660 330 220 50 <br />60 720 360 240 50 <br />65 780 390 260 50 <br />70 840 420 280 50 <br />75 900 450 .300 50 <br />,-Posted speed limit.off-peak 85th-percentile speed prior to work starting.or the anticipated operating <br />speed in mph. <br />"-For other offsets use the following merging taper length formula for L: <br />For speeds of 40 mph or less.L=WS2/60 <br />For speeds of 45 mph or more,L=WS <br />Where:L =taper length in feet <br />W =width of offset if!feet <br />S =posted speed limit,off-peak 85th-percentile speed prior to work <br />starting.orthe anlicipated operating speed in mph <br />'"-Maximum downstream taper length Is 100 feet.See Section 6C.08. <br />Chapter 6H -Typical Applications <br />Part 6 -Temporary Traffic Conlrol <br />November 7,2014