Laserfiche WebLink
,.. <br />NOTES: <br />1.If the distance between cross-cuts are less then 150'the entire orea between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements shall be in addition'to County Standard Drawing No.R-29 .. <br />3 ..Resurfacing for Bell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lone,only that area sholl be resufaced as shown. <br />4,If cross-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu ofIresurfacing,Section 2-5.03 (B-2). <br />ue Q!0 +'~(lJ(lJ~Lu~"0 e <br />4-Q)OLeO::J a'"c=O"..c:0c:t::...c.-3'Q.eJ 1;](jJPavedShoulder14I'x Q)« <br />(lJ"••..o a <br />-'I I !(lJ'tre::J..c:Il o (jJ "w ,O:::~EIrIJT <br />~%:ff ~a <br />~~L ~,-// <br />T .'a <br />L ;;,:,1~I I I"*',, <br />21 <br />I II0z,, <br />(lJ1 <br />I I 1I~i , <br />I I wI,, <br />T <br />0 <br />L .1T-;~l-c;0 '00L~'/.•...'"I I I -(jJE 2,i .:JolI,,_. <br />Approved by: <br />No.Revision Oescri lion Dote