PS-1600891
<br />SPECIAL CONDITIONS FOR
<br />CALWATER -#8288
<br />ENCROACHMENT PERMIT
<br />March 31,2016
<br />1,Maintain traffic controls for all roads,Traffic control delays shall not exceed 15 minutes,
<br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or
<br />plated,During working hours,two-way traffic control shall be maintained with one lane open and
<br />appropriate flaggers,
<br />2,Access to all properties shall be maintained at all times except when work is occurring at the
<br />access point.Minimal delays will be allowed to provide access within the work zone area,
<br />Driveway access shall be fully restored at the end of each workday,Driveways disturbed by the
<br />contractor shall be replaced with in-kind or better materials,
<br />3,Residents and businesses shall be notified in writing,as approved by the County,48 hours in
<br />advance of any impacts to their access,
<br />4,Any areas where parking is to be restricted shall have signs noting the restrictions in place,at
<br />least 48 hours in advance,
<br />5,Existing fences shall not be removed without written consent of the property owner.Such consent
<br />shall be submitted to the County prior to the removal.Fences removed shall be restored with in-
<br />kind or better materials,Restored fences shall not encroach into County right-of-way,
<br />6,All destroyed or obliterated pavement markings must be replaced in kind by the permittee,Typical
<br />pavement markings include but not limited to lane lines,centerlines,stop and stop ahead
<br />legends,limit lines,raised pavement markers and miscellaneous delineators,
<br />7,The Permittee is responsible for the preservation of survey monuments located within the area of
<br />work herein permitted,Prior to the start of construction,survey monuments that potentially may
<br />be disturbed shall be located and referenced by a Licensed Land Surveyor,and a Corner Record
<br />filed with the County Surveyor.Any Survey Monuments disturbed during the course of
<br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed
<br />with the County Surveyor,(Land Surveyors'Act Section 8771)
<br />8,All pipe and pipeline related facilities including,but not limited to,valves,utility boxes and vaults,
<br />and frames and covers shall be maintained by Cal Water,including any facilities that are
<br />abandoned in place,Cal Water shall be responsible for any and all costs associated with the
<br />removal,relocation and/or adjustment of these facilities as determined by the County at Cal
<br />Water's expense,(Streets and Highways Code Section 1463)
<br />9,All future maintenance of the pipeline and related facilities within the County right-of-way will
<br />require a San Joaquin County Encroachment Permit.
<br />10 Bell Holes shall be maintained in a smooth and even condition to the satisfaction of the County
<br />throughout the project limits at all times,
<br />11,All bell holes shall be completely backfilled or shored and plated at the end of each workday,and
<br />the roadway restored to two-way traffic,If plating is to be used,a trench shoring and plating plan
|