My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600650
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600650
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:49:59 AM
Creation date
4/19/2016 10:46:27 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600650
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
S/S OF TAYLOR RD 225'W/O WASTGATE DR
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1600650
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROYISfONg <br />Wmter Weatlier Utility Wotk <br />1.SUPERVISioN:.The utility c=pany (permittee)sball :fu.raishfull-time supervision of alI work to insure.compliance with the pe.r.oiitprovision. <br />2.START OF WORK:No WOrkwithin the Countyright-of.way sbalI be started until the utility company <br />representative has made an evaluation of weather conditiens and has determined the wode can be . <br />"accomplished under the provisions ofthe pemut.. <br />3.CLEAN PAVElI1ENT:Dirt and mud s1;J.aUnot be deposited'on the pavement outside the area of work, <br />and if inadvertently tracked onto the rpad travel way shall b~removed irrui1ediately. <br />4.DAILY RESTORATION:'Private driveways and road intersections shall be.restoreddaily. <br />5.VYEATHER-TIGH'I'CONDITIONS:All trenches shall be filled and compacted,"ditches and other <br />drainage facilities regarded and opened,and the entire work area restored to weather~tight condition prior toanyram.
The URL can be used to link to this page
Your browser does not support the video tag.