My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600652
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:50:03 AM
Creation date
4/19/2016 10:49:59 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600652
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
N/S OF SUNNY RD 1027'E/O KINGSLEY RD
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1600652
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
PS-1600652 <br />SPECIAL CONDITIONS FOR <br />PG&E -PM 31210169 <br />ENCROACHMENT PERMIT <br />March 14,2016 <br />1,Maintain traffic controls for all roads,Traffic control delays shall not exceed 15 minutes, <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated, <br />2,Access to all properties shall be maintained at all times except when work is occurring at the <br />access point.Minimal delays will be allowed to provide access within the work zone area, <br />Driveway access shall be fully restored at the end of each workday,Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials, <br />3,Residents and businesses shall be notified in writing,as approved by the County,48 hours in <br />advance of any impacts to their access, <br />4,Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance, <br />5,Existing fences shall not be removed without written consent of the property owner.Such consent <br />shall be submitted to the County prior to the removal.Fences removed shall be restored with in- <br />kind or better materials,Restored fences shall not encroach into County right-of-way, <br />6,Work shall not be permitted within the San Joaquin County right-of-way between November 1 and <br />March 31 without prior authorization from the San Joaquin County Field Engineering Division, <br />contact them at 209-953-7421, <br />7.All destroyed or obliterated pavement markings must be replaced in kind by the permittee.Typical <br />pavement markings include but not limited to lane lines,centerlines,stop and stop ahead <br />legends,limit lines,raised pavement markers and miscellaneous delineators. <br />8.The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted.Prior to the start of construction,survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor,and a Corner Record <br />filed with the County Surveyor.Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor.(Land Surveyors'Act Section 8771) <br />9.All pipe and pipeline related facilities including,but not limited to,valves,utility boxes and vaults, <br />and frames and covers shall be maintained by PG&E,including any facilities that are abandoned <br />in place.PG&E shall be responsible for any and all costs associated with the removal,relocation <br />and/or adjustment of these facilities as determined by the County at PG&E's expense.(Streets <br />and Highways Code Section 1463) <br />10.All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit. <br />11.Bell Holes shall be maintained in a smooth and even condition to the satisfaction of the County <br />throughout the project limits at all times.
The URL can be used to link to this page
Your browser does not support the video tag.