My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600652
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600652
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:50:03 AM
Creation date
4/19/2016 10:49:59 AM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600652
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
N/S OF SUNNY RD 1027'E/O KINGSLEY RD
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1600652
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISION~ <br />Winter Weallier Utility Work <br />1.SUPERVISioN:'The utility company (permittee)sball:fi.ullish full-time supervision of all WOlle to inSIDe,co:r.rrp-Iiancewith the pei:riJit provision. <br />2.START OF WORK:No work:within me Countj right-of-way shall be started.uutil the utility company <br />representative has made an evaluation of weather cOllditiens and has determined the work:can be ' <br />"accomplished under the provisions of the pemut. <br />3.CLEAN:P A VErI1ENT:Dirt and mud s1J.aIlnot be deposited'on the pav=ent outside the area of work, <br />and ifinad,vertent1y tracked onto the rpad travel way shall be removed immediately, <br />4.DAILY RESTORATION:''Private driveways and road intersections shall be-restored daily. <br />5.mATEER-TIGEr COl\TDITIONS:All trenches shan be filled and compacted,'ditches aud other <br />drainage facilitie.s regarded and opened,and the entire work area restored to weather~tight condi.tion prior toanyram,
The URL can be used to link to this page
Your browser does not support the video tag.