Laserfiche WebLink
NOTES: <br />1.If the distance between cross-cuts are less then 150'the entire area between <br />corss-cuts shall be planed and resurfaced with one (1)inch of Asphalt Concrete. <br />2.The resurfacing requirements shall be in addition to County Standard Drawing No. <br />R-29. <br />3.Resurfacing for Bell Holes shall meet these requirements.If excavation occurs within <br />the shoulder or lane,only that area shall be resufaced as shown. <br />4.If cross-cutting is performed on Local Roads at intervals less then 150'a Seal <br />Coat for that half of the roadway containing the trench can be used in lieu of <br />resurfacing.Section 2-5.03 (B-2). <br />Paved Shoulder----t-1 <br />r' <br />"-w <br />T"0IT"0 <br />.L <br />1, <br />I <br />,~["*',~Iz'.,1."U1[ <br />8'!II <br />1, <br />I <br />uCo .2~., <br />.,~L()~()o Ct.,o::lcUwO+' <br />0'l:S 00'~~w w'x Q)« <br />Q)g4-.,to <br />C::l-<::lE~gL._ <br />t <br />~w <br />T"0IT"0 v/.I ,I , <br />I I I <br />.1l"=;'tu <br />...,w.-wE2:.Ju <br />Approved by: <br />jtLIflr <br />No.1 Revision Description I Date <br />~~4v"'~ <br />Working for YOU <br />TRENCH CUTTING POLICYCROSSCUTTINGOFCOUNTYROADWAYS <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUBLIC WORKS <br />-1-Oa-te-:-M-A-Y-Z-01-5IStd.Dwg.No.R-36