My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600578
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600578
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:49:19 AM
Creation date
4/20/2016 2:33:07 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600578
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
N/S ALMOND ST 70'E/O ATHEARN ST
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1600578
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
..'-. <br />SPECIAL PROVISIONS <br />.:;. <br />Winter Weather Utility Work <br />," <br />1.SUPERVISIoN:The utility compaJ;ly(perni.irte,e)s4all furnisn ful1~timesupervision of all work to insure <br />,compliance with the permit provision,.:'..',,...."..'. <br />2.START OF WORK:No,work within th6 'County right-of-way shall be ~ed until the utility.company <br />representative has made an evaluation of weather conditions and has determined the work can be ' <br />"accomplished under the provisions of the'permit.', <br />3.CLEAN PAVEMENT:'Dirt and mud sl;1aIlnot be d~p~;ii~d'on the pavement outside the area of work, <br />and if inadvertently trackedonto"the road trli"er "\yaY'~hall be removed.imniediafely.' <br />4.DAILY RESTORATION:'Pri'iiate drive-ways'aJi.dtoad intersections shall be restored daily. <br />5.WEATHER-TIGHT CONDITIONS:,'All:h;enches sh'aIlbe fiUed and compacted,.ditches and other , <br />drainage facilities regarded and opened,.andtheenme work are"restored t~'weather-tight condition prior to', <br />any rain,"..'"",,','.',':',"', <br />..'.."'." <br />,----. <br />" <br />'.:.... <br />~..~.......' <br />'.". <br />'.".'.'.."..:.....~.'.. <br />".... <br />.":. <br />,, <br />F:\PERMlTS COUNTER.\geoeraI PTovisions\W"m~Weather Provisiom.dot::C .
The URL can be used to link to this page
Your browser does not support the video tag.