My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600582
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600582
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:49:22 AM
Creation date
4/20/2016 2:33:16 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600582
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
E/S 3RD ST 65' S/O B ST
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1600582
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS <br />.,:" <br />Winter Weather Utility Work <br />.'" <br />1.SUPERVISioN:The utility c6mp~y (perJJiitte:e)sJ:,a1lfurnish ful1~timesupervision of all work to insme <br />,compliance with the permit provision,",.....".'.,'..... <br />2.START OF WORK:No work within tkCountyright-of-way shall be st;med until the utility company <br />representative has made an evaluation of weather conditions and has determined the-work can be' <br />"accomplished under the provisions of the'permit.', <br />3.CLEAN PAVEMENT:'Dirt and m:uds1~1lnot be d~p~;it~d'on the pavement outsIde the area of work, <br />and if inadvertently trackedonto"theIoad tr!lyd 'Y.aY'~haUbeIemoved in;lniediately.' <br />4.DAILY RESTORATION:'Pri~ate driveWays'arid'toad intersections shall be restored daily.,' <br />5.WEATHER-TIGHT C01'IDffiONS:,'All,b.;ench"sshan be filled and compacted,ditches and:other , <br />drainage facilities regarded and opened,and the 'entire work are(trestored to 'weather-tight condition prior to ',any~.',,:'"',"',.."..'.....',',..',' <br />,---- <br />'.:',. <br />~..-...:." <br />".. <br />"." <br />.',.:.,...~.'.. <br />..... <br />..":. <br />,, <br />F;\PERMITS COUNTER\generaI provisions\WiIl!~We:atber Provisions.doClC .
The URL can be used to link to this page
Your browser does not support the video tag.