Laserfiche WebLink
See Note 1 Below <br />10"Min <br />00+20"Min <br />10" <br />See Note 2 Below <br />Compact in 12"max <br />layers to a min relative <br />compactian of 95% <br />under pavement.and <br />90%outside pavement. <br />10"Min <br />~;; <br />/~/ <br />~;- <br />~;- <br />~Ct.24"ompac m max <br />~layers to a min relative <br />~compactian of 85%. <br />Compact in 6"layerstoaminrelative <br />compaction of 90%. <br />o <br />00+20"Min <br />10"Min <br />RIGID CONDUIT FLEXIBLE CONDUIT <br />NOTES: <br />1.New pavement shall be 1"thicker than existing pavement.mmlmum <br />of 0.25 Ft.New base shall be 1"thicker than existing base.min of 0.50 Ft. <br />2.Select native material or imported granular material as approved by the Director <br />of Public Works.Backfill with materials equal to or better than the existing <br />pavement and base in quality. <br />3.Relative compaction of materials shall be tested in accordance with <br />the State of California.Dept.of Transportation Testing Manuals.test <br />method No.California 216 or 231. <br />4.All existing pavement shall be neatly cut to line prior to trench excavation. <br />5.Jetting or panding will be permitted within the street right-of-way with <br />a 3 year bond.when approved by the Director of Public Works. <br />6.When shown by soil composition and compactability.ninety percent (90%) <br />compaction may be used.when approved by the Director of Public Works. <br />7.Special bedding and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Approved by: <br />No.Revision Oescri tion Dote <br />TYIPCAL TRENCH BACKFILL <br />R-29 <br />COUNTY OF SAN JOAQUIN <br />DEPARTMENT OF PUDUC WORKS <br />Dote:DEC 2014 Std.Dwg.No.Working for YOU