My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600603
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1600501 thru PS-1601000
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1600501 thru PS-1601000_ - PS-1600603
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:49:32 AM
Creation date
4/20/2016 2:34:53 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1600603
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1600501 thru PS-1601000
Year2
2016
Address
W/S ESCALON BELLOTA RD 450'N/O DECH RD
Application
PACIFIC GAS & ELECTRIC-STOCKTON
Supplemental fields
APN
PS-1600603
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISIONS <br />•0"•••'.'.',:. <br />Winter Weather Utility Work <br />," <br />.'.r1.SUPERVISION:The utility compaJ;ly(per;Di.itfe,e)shall furnisD.full°tiIDesupervision of all work to insure <br />,compliance with the permit provision,", <br />••••."•••,'f •• <br />,, <br />2.START OF WORK:No work within the'County.nght-of-way shall be started:until the utility company <br />representative has made an evaluation ofweatherconditiollS and has determined the work can be' <br />"accomplished under the provisions of the'permit.' <br />3.CLEAN PAVEMENT:'Dirt and U:ud si;annot be d~p~;it~d'on the pavement outside the area of work, <br />and ifinadverten~y tracked Dnto,.theroad trily.d 1Yay"~hallbe'removed in;Ini.ediafely.' <br />4.DAILY RESTORATION:'Pri-iiatedriveways'aJidtoad intersections shall be restored daily. <br />5.WEATHER-TIGHT CONDITIONS:,);ll:lr;enches shan be,filled andccimpaeted,ditches and other , <br />drainage facilities regarded and opened,and ille entire work are?!-restored to .weather-tight condition prior to ',..'...any ram.'',,..'' <br />'.'.''.,"",. <br />., <br />'.:',. <br />," <br />~..~...:." <br />".. <br />".," <br />.','......~..'. <br />..... <br />,', <br />....:. <br />", <br />",
The URL can be used to link to this page
Your browser does not support the video tag.