My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601032
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1601001 thru PS-1601500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601032
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:51:15 AM
Creation date
4/20/2016 2:37:37 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1601032
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1601001 thru PS-1601500
Year2
2016
Address
E/S OF NEWCASTLE RD 26'S/O MC KESSON AV
Application
PACIFIC GAS & ELECTRIC -STOCKTON
Supplemental fields
APN
PS-1601032
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
._--,------_.__.•._-_......•.-.--_.•.-...~-,._---.....,._.__.~--_..--~-------~--- <br />.!'-•....• <br />.:S~~""Note 1 Below <br />10"10"Min <br />r-::Existingr-f Pavement <br />~.See Note ;2 Below <br />Compact in 12"maxlayersto,a min relative <br />compaction of 95% <br />under pavement and <br />90%outside pavement, <br />y <br />~:<~~,;; <br />'"Compact in 24"max <br />~layers to a min relativetcompactionof85%, <br />7"":;7-:;::::'/,,"."'''..Compact in 6",layerstoaminrelative <br />compaction of 90%. <br />OD <br />4-20"Min <br />OD+20"Min <br />RIGID CONDUIT FLEXIBLE CONDUIT <br />NOTES: <br />1.New pavement sholl be 1"thicker than existing pavement,minimum <br />,of 0,25 'Ft.New bose shall be 1"thicker than existing bose,min of 0.50,Ft. <br />2,Select native materi(J1 or imported granular material as approved by the Director <br />6f Public Works,Backfill wi,th materials equal to or better than the existing <br />pavement and bas~in quality, <br />3,Relative compaction of 'materials shall be tested in accordance with <br />the State of'California,Dept.of Transportotion Testing Manuals,test <br />method No,California 216 or 231. <br />4.All existing pavement shall be neatly cut to line 'prior to trench .excovation, <br />5.Jetting or ponding will be'permitted within the street right-of-way with <br />a 3 year bond,when'approved by the Director of Public Works. <br />6,When shown by soil composition and compoctability,ninety percent (90%) <br />compaction may be used!when approved by the Director of Public Works. <br />7,Special be'dding'and backfill requirements may be shown on the plans or <br />specified in the special provisions. <br />Approved by: <br />No.Revision Oeseri tion Date
The URL can be used to link to this page
Your browser does not support the video tag.