My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601038
PublicWorks
>
- PUBLIC SERVICES
>
PERMITS & DEVELOPMENT
>
Encroachment(EP)/Driveway(DW) Permits
>
2016
>
PS-1601001 thru PS-1601500
>
Permits & Development - Encroachment(EP)/Driveway(DW) Permits - 2016_PS-1601001 thru PS-1601500_ - PS-1601038
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 8:51:18 AM
Creation date
4/20/2016 2:38:10 PM
Metadata
Fields
Template:
Permits_Development
DocName
PS-1601038
Category07
Encroachment(EP)/Driveway(DW) Permits
SubCategory07
2016\PS-1601001 thru PS-1601500
Year2
2016
Address
S/S OF SONOMA AV 508'W/O KIRK AV
Application
PACIFIC GAS & ELECTRIC - STOCKTON
Supplemental fields
APN
PS-1601038
Cross Ref
PWP730052
Type (2)
Encroachment Permit (EP)
Tags
Permits_Development
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
SPECIAL PROVISfON£1 <br />.\Thntm Weather Utili!:yIVork <br />1.SUPERVISION:The utility company (permittee)shall funlish [,Ill-time supervision of all work to iusUIe <br />.compliance with the peiTJiitprovision. <br />z.START OF WORK:No Worlcwithiuthe County right-of-way shall be staned until the utility company <br />representative laBs mad.e an evaluation of weather conditi0Ds 811dhas determined the work can be ' <br />"accomplished undertlieprovisioDS oHlle pemur . <br />3.,CLEM'!PAVEMENT:Dirt and mud sl;tallnot be deposited on the pavement outside the area of work, <br />and if iuadvertently tracked 01110 the r,oad travel way shall be removed ilJ:lJilediately, <br />4.DAILY RESTORATIOI'1:'Private driveways and road iutersections shall be.restored daily. <br />5.WEAU-illIl-TIGHT CONDITIONS:All trenches shall be filled aud compacted,c!itches and other <br />cIraillage facilities iegarded and opene[l and the entire work area restored toweathedight condition prior toanyram.
The URL can be used to link to this page
Your browser does not support the video tag.