Laserfiche WebLink
PS-1601039 <br />SPECIAL CONDITIONS FOR <br />PG&E -PM 42678641 <br />ENCROACHMENT PERMIT <br />'-April 15,2016 <br />1.Maintain traffic controls for all roads.Traffic control delays shall not exceed 15 minutes. <br />Two-way traffic shall be maintained during non-working hours with excavated areas backfilled or <br />plated.During working hours,two-way traffic control shall be maintained with one lane open and <br />appropriate flaggers. <br />2.Access to all properties shall be maintained at all times except when work is occurring at the <br />access point Minimal delays will be allowed to provide access within the work zone area. <br />Driveway access shall be fully restored at the end of each workday.Driveways disturbed by the <br />contractor shall be replaced with in-kind or better materials.. <br />.3.Residents and businesses shall be notified in writing,as approved by the County,48 hours in <br />advance of any impacts to their access. <br />4.Any areas where parking is to be restricted shall have signs noting the restrictions in place at <br />least 48 hours in advance. <br />5.Existing fences shall not be removed without written consent of the property owner.Such consent <br />shall be submitted to the County prior to the removal.Fences removed shall be restored with in- <br />kind or better materials.Restored fences shall not encroach into County right-of-way., <br />6.All destroyed or obliterated pavement markings must be replaced in kind by the permittee.Typical <br />pavement markings include but not limited to lane lines,centerlines,stop and stop ahead <br />legends,limit lines,raised pavement markers and miscellaneous delineators. <br />7.The Permittee is responsible for the preservation of survey monuments located within the area of <br />work herein permitted.Prior to the start of construction,survey monuments that potentially may <br />be disturbed shall be located and referenced by a Licensed Land Surveyor,and a Corner Record <br />filed with the County Surveyor.Any Survey Monuments disturbed during the course of <br />construction shall be reestablished by a Licensed Land Surveyor and another Corner Record filed <br />with the County Surveyor.(Land Surveyors'Act Section 8771) <br />8.All pipe and pipeline related facilities including,but not limited to,valves,utility boxes and vaults, <br />and frames and covers shall be maintained by PG&E,including any facilities that are abandoned <br />in place.PG&E shall be responsible for any and all costs associated with the removal,relocation <br />and/or adjustment of these facilities as determined by the County at PG&E's expense.(Streets <br />and Highways Code Section 1463) <br />9.All future maintenance of the pipeline and related facilities within the County right-of-way will <br />require a San Joaquin County Encroachment Permit <br />10.Bell Holes shall be maintained in a smooth and even condition to the satisfaction of the County <br />throughout the project limits at all times': <br />11.All bell holes shall be completely backfilled or shored and plated at the end of each workday,and <br />the roadway restored to two-way traffic.If plating is to be used,a trench shoring and plating plan